Piping Length Factory Charged (kg) Additional Charge (kg) 30m 40m 50m 60m 70m 75m PUZ-ZM71 2.80 0.40 0.80 - - - PUZ-M100 3.10 0.40 0.80 - - - PUZ-M125 3.60 0.40 0.80 - - - PUZ-M140 4.00 0.00 0.00 - - - PUZ-ZM100/125/140 4.00 0.40 0.80 1.20 - 1.80 PUZ-ZM160 5.00 0.70 1.40 2.10 2.10 2.10 PUZ-ZM180 5.00 0.70 1.40 2.10 2.10 2.10 Piping Length Factory Charged (kg) Additional Charge (kg) 50m 60m 70m 75m 100m PUZ-ZM200 5.50 0.70 1.40 1.80 2.10 PUZ-ZM250 6.50 0.90 1.80 2.30 2.80 AMOUNT OF REQUIRED REFRIGERANT R32:KG Piping Length Factory Charged (kg) Additional Charge (kg) 7m 10m 15m 20m 25m 30m SUZ-M25 0.65 0.06 0.16 0.26 - - SUZ-M35 0.9 0.06 0.16 0.26 - - SUZ-M50 1.2 0.06 0.16 0.26 0.36 0.46 SUZ-M60 1.25 0.06 0.16 0.26 0.36 0.46 SUZ-M71 1.45 0.12 0.32 0.52 0.72 0.92 Amount of Required Refrigerant (R32: kg) Refrigerant Piping Capacity Between Indoor and Outdoor Units Pipe Size OD (mm – in.) Thickness (mm) Max. Height Difference (m) Max. Piping Length (m) SUZ-M25/35 12 20 Liquid: Ø 6.35 – 1/4” t 0.8 Gas: Ø 9.52 – 3/8” t 0.8 SUZ-M50 30 30 Liquid: Ø 6.35 – 1/4” t 0.8 Gas: Ø 12.7 – 1/2” t 0.8 SUZ-M60 30 30 Liquid: Ø 6.35 – 1/4” t 0.8 Gas: Ø 15.88 – 5/8” t 1.0 SUZ-M71 30 30 Liquid: Ø 9.52 – 3/8” t 0.8 Gas: Ø 15.88 – 5/8” t 1.0 PUZ-ZM71 30 50 Liquid: Ø 9.52 – 3/8” t 0.8 Gas: Ø 15.88 – 5/8” t 1.0 PUZ-M100/125/140 30 55 Liquid: Ø 9.52 – 3/8” t 0.8 Gas: Ø 15.88 – 5/8” t 1.0 PUZ-ZM100/125/140 30 75 Liquid: Ø 9.52 – 3/8” t 0.8 Gas: Ø 15.88 – 5/8” t 1.0 PUZ-ZM160/180 30 75 Liquid: Ø 9.52 – 3/8” t 0.8 Gas: Ø 19.05 – 3/4” t 1.0 PUZ-ZM200 30 100 Liquid: Ø 9.52 – 7/8” t 1.0 Gas: Ø 22.2 – 7/8” / 25.4 (1)*3 t 1.0 PUZ-ZM250 30 100 Liquid: Ø 12.70 – 4/8” t 0.8 Gas: Ø 22.2 – 7/8” / 25.4 (1)*3 t 1.0 *3 If the pipe length is 50 m or more, a gas pipe of ø25.4 is required. Note: Above specifications are for outdoor units only. 21
RkJQdWJsaXNoZXIy MTg0ODUyNA==